Abstract
Summary
Hydraulic fracturing has historically been a prime engineering tool for improving well producing rates, either by circumventing near-well damage or by stimulating well performance. This paper describes a somewhat new fracturing application where increasing rate was not the primary goal. In this case, the goal for fracturing was modification of the flow profile to allow a more uniform vertical production profile and thereby maximize sand-free rates over the perforated section of the reservoir. In best cases for such applications, this technique allows perforating of "weak" rock to be skipped, reduces risks of sand production, and allows greater wellbore drawdown through perforated intervals in more competent reservoir rock. This allows better long-term productivity and improved recovery and total project economics. In short, it was hoped that propped fractures would improve reservoir management of the Etive/ Rannoch formations in the Gullfaks field.
Publisher
Society of Petroleum Engineers (SPE)
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献