Concerning the Calculation of Inflow Performance of Wells Producing from Solution Gas Drive Reservoirs

Author:

Standing M.B.1

Affiliation:

1. Standard Oil Co. of California

Abstract

Estimating probable flow rates of wells producing from solution gas drive reservoirs is a problem frequently encountered by petroleum engineers. One approach to an answer involves the simultaneous solution of the well's inflow performance relationship (IPR) and the rate-dependent pressure losses in the well tubing, surface flow lines, and chokes. Nind covers very nicely several graphical methods of accomplishing the simultaneous solution. This note presents relationships that can be used to obtain IPR presents relationships that can be used to obtain IPR curves applicable to bounded solution gas drive reservoirs in which the average reservoir pressure is less than the reservoir fluid bubble-point pressure. Vogel's dimensionless IPR equation is the basis for the development. An example illustrates how future IPR curves can be developed from a current productivity index value. Vogel developed a general dimensionless relationship for wells producing under conditions outlined above and under pseudosteady-state conditions given by Eq. 1. (1) =  1 - 0 .2 - 0 .8  , where qo = stock-tank oil producing rate, B/D pwf = wellbore flowing pressure, psi pwf = wellbore flowing pressure, psip = average reservoir pressure, psi p = average reservoir pressure, psi qo max = maximum rate the well would producefor conditions of pwf = 0. Eq. 1 can be rearranged to = ...............(2) The productivity index of a well is defined by (3) J  = Substitution of Eq. 3 into Eq. 2 yields (4) J  = Physical conditions inherent in Eq. 4 are that reservoir Physical conditions inherent in Eq. 4 are that reservoir gas and oil saturations, as well as reservoir pressure, vary with distance away from the wellbore, and that the well's skin factor is zero. Let us now consider the situation in which fluid saturations are the same everywhere in the reservoir. This is analogous to a "zero drawdown" situation. Let J* be the well's productivity index under these conditions. Mathematically, (5) lim J J*  = Applying the limit conditions to Eq. 4 yields (6) J*  = P. 1141

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 25 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3