Initial Observations From a Bakken Microproppant Field Trial

Author:

Palisch Terry1,Lorwongngam Apiwat Ohm2,Kalfayan Leonard2,Giesbrecht Jon1

Affiliation:

1. CARBO Ceramics

2. Hess

Abstract

AbstractThe Bakken production system is well established as a premier oil producing basin. Over the last 20 years improvements in drilling and completion designs have led to significant improvements in well productivity and increased EUR. One recent design change has been the incorporation of microproppant in the fracture design, which was deployed in a multi-well field study and shown to improve production, and is the subject of this paper.As the industry continued to move to smaller size proppant, microproppants have been introduced as another potential improvement in the fracture design, supplementing the benefits of 100 mesh sand. It is theorized that microproppant can provide two primary benefits to well productivity – propping open microfractures, which reduces the production decline, and assisting in the breakdown of the perforations, thereby improving cluster efficiency. Production improvement has been documented in various basins across North America, leading one operator to design and implement a multi-well field trial to evaluate the production impact of microproppant in their Bakken completions.This paper will provide a brief overview of microproppant technology and recent deployments across other basins, illustrating both productivity improvement as well as enhanced proppant placement. It will then focus on the multi-well field study performed in the Bakken in late 2021. In this trial, seven wells included the use of microproppant and are compared to 13 offset wells which deployed a comparable completion design, but without the microproppant. In the study area, the lateral lengths and proppant deployed per foot of lateral were held constant, and the wells/results are segregated between the Middle Bakken and Three Forks benches. To date, wells deploying microproppant show an average overall production uplift sufficient for the operator to pursue a larger scale field trial. This paper will discuss the completion design including details on how the microproppant was deployed. It will also include the general, initial production comparison between the trial and control wells.This paper will continue to challenge engineers thinking on the role of proppant and how to best engineer the completion and fracture design to maximize recovery and return on investment. It will review a field study deploying the use of microproppant, as well as the design details, making it beneficial for completion engineers who desire to deploy microproppant. It will also be valuable for reservoir engineers searching for ways to improve cluster efficiency and overall hydrocarbon recovery.

Publisher

SPE

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3