Abstract

Abstract The current oil and gas industry uncertainty encourages innovative, efficient, and simple drilling and workover solutions. Challenging and problematic formations cause various design complications and operational risk. These include lost circulation, well control incidents, high density drilling fluid systems, tool design limitations, etc. Such troubles can also lead to liner and casing leaks downhole and eventually undesired surface pressure buildups across the tubing-casing and casing-casing annuli. The case study well was drilled and completed, but prior to production a tubing-casing annular pressure of 6,500 psi was recorded. With two liners in the well casing designs (4-1/2 in. and 7 in.), a well leak was suspected to be at the top of the 7 in. liner as it was laying across a deep and over-pressurized formation with a 152.5 pcf gradient. After commencing the workover operations and due to downhole leaks and washouts, the well had to be killed off-bottom with 160 pcf manganese tetroxide (Mn3O4) mud. The well was fully decompleted, except for the production packer, which was left in hole. Investigation and diagnostic operations showed leaking 7 in. liner body and liner top packer. To repair the leaking 7 in. liner, the team introduced an innovative design with a 4-1/2 in. x 7 in. tapered scab liner to sting into the newly installed repair packer and extend above the existing 7 in. top of liner to set on the 9-5/8 in. casing, and so cover the leaks. A mechanical 7 in. x 9-5/8 in. hanger and liner top packer system was deployed to allow for cementing the scab liner then setting these mechanical tools, where hydraulically actuated systems were impractical. Due to the high kill mud density of 160 pcf, a special 165 pcf Mn3O4 -Hematite cement recipe was adapted. Despite the high slurry density, this formulation allowed for optimal mixing, pumping, and leak isolation operations. This paper will highlight the case study well history and challenges leading to liner leaks while emphasizing the nature of the over-pressurized formation. It will demonstrate the mechanical tapered scab liner design and deployment procedures in comparison to the conventional scab and tie-back liner jobs.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. ‘Level-off’ cement plugging method to cure lost circulation verified with case studies;Journal of Petroleum Exploration and Production Technology;2021-05-28

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3