Abstract
AbstractControlling lost circulation during drilling operations in a reservoir prone to fluid losses is typically remedied by cement squeezing or plug setting as the last resort. The aim being to minimize or stop drilling fluid losses and to regain full returns at surface, and to maintain wellbore integrity. Different placement methods of cement plugs have been discussed in detail in the literature, except for the ‘level-off’ method, which can be effective for curing complete loss circulation cases. Following modeling and calculations of this cement plug placement method, its design and execution procedures are discussed, together with two successful field cases in highly fractured carbonate reservoirs in the Middle East. Using drill pipe and a Retrievable-Test-Treat-Squeeze (RTTS) packer, set with some spacing from the loss zone, the method entails that the cement slurry is allowed to drop by gravity in order to cure lost circulation. As the column of fluid, mud and slurry in the well exceeds formation pore pressure, i.e., overbalanced conditions, a volume of acid-soluble cement slurry is allowed to slowly drop and freely penetrate the formation, i.e., through its fractures or caverns. During the penetration of this viscous slurry into the loss zone, the cement slurry can set and the fracture or fissure openings are plugged. Presented are detailed design calculations for the level-off placement technique, determination of required cement slurry and displacement volumes, and recommended displacement and RTTS packer setting depths. The expected depth of the top of cement plug is estimated. The design parameters are compared with field cases and explanations are given for possible discrepancies. Success of the operation is discussed in terms of final mud loss after cement plugging and Non-Productive Time mitigation. Detailed field procedures and execution are also presented. The level-off job is already practiced by the industry, but it is not published in the literature, in some cases they have different methods with causing some errors. To the best of authors’ knowledge, this is the first detailed description and stepwise calculation of the level-off cement placement technique in the literature.
Publisher
Springer Science and Business Media LLC
Subject
General Energy,Geotechnical Engineering and Engineering Geology
Reference21 articles.
1. Abbas R, Dole S, Junaidi HE, El-Hassan H, Francis L, McCraith S, Shuttleworth N, Van Der Plas K, Messier E, Munk T, Nodlans N, Svendsen RK, Therond E, Taoutaou S (2003) A safety net for controlling lost circulation. Oilfield Rev 15(4):20–27
2. Alberty MW, McLean MR (2004) A physical model for stress cages. SPE annual technical conference and exhibition, Houston, Texas, 26–29 September, SPE-90493-MS, DOI: https://doi.org/10.2118/90493-MS
3. Aljubran MJ, Ombe EM, Alluhaydan AS, Thomas S (2018) ‘Innovative mechanical tapered scab liner design and deployment to restore well integrity’ SPE kingdom of saudi arabia annual technical symposium and exhibition, Dammam, Saudi Arabia, 23–26 April 2018, https://doi.org/10.2118/192407-MS
4. Alrasheed A, Oqaili AH, Aljubran MJ, Ezi PC (2018) Deployment of fully automated MPD and manganese tetroxide mud system to drill ultra-narrow mud window in HPHT gas wells. Paper presented at the SPE/IADC managed pressure drilling and underbalanced operations conference and exhibition, New Orleans, Louisiana, USA https://doi.org/10.2118/190000-MS
5. Al-Sabagh AM, El-Awamri AA, Abdou MI, Hussien HA, Abd El Fatah HM, Rasmy WE (2016) Egyptian diatomite as high fluid loss squeeze slurry in sealing fractures and high permeable formation. Egypt J Pet. https://doi.org/10.1016/j.ejpe.2015.09.005
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献