Study of preparatory activities on using BIM-technologies in the medical enterprise design

Author:

Karakozova Irina V.1,Malykha Galina G.2,Pavlov Alexander S.3,Panin Andrey S.4,Tesler Nadezhda D.4

Affiliation:

1. Research analytical center (NIAZ)

2. Moscow State University of Civil Engineering (National Research University) (MGSU)

3. All-Russian Research Institute for Nuclear Power Plants Operation (VNIIAES)

4. Giprokon

Abstract

Introduction. When designing buildings and installations, Building Information Modeling (BIM) is spread more and more widely. The adoption of national and international standards and classifications is of great importance for the implementation of information technology. Application of the BIM-technologies for constructing public buildings, in the first turn, medical ones, seems to be very promising. The paper discusses the problems of developing indigenous parametric blocks (families) and preparatory activities in using the BIM-technology. Materials and methods. One of the information technology tasks is to develop equipment specifications and transfer them through the technological chain of the construction facility life cycle. The creation and application of classifiers are necessary to prepare for using the BIM-technologies. Results. A project of an academic health science centre with an extensive equipment range is analysed. The project of a modern medical building contains a description of several hundreds of specific medical equipment types. The specifications should contain information, including denominations and quantities of the equipment units, data on overall dimensions and weights of the units, connection interfaces to the power supply, water supply, water drainage. When creating parametric blocks, the international classifiers Uniclass-2015 and OmniClass are often used. However, they do not cover the necessary equipment range and contradict the domestic practice of purchasing equipment and services for state demand. Conclusions. The cost of preparing for the design process as creating parametric blocks can make a total of tens or hundreds of man-days that should be taken into account when planning design activities. In terms of procurement for state and municipal demand, it is necessary to make design specifications following the available range of medical equipment.

Publisher

Moscow State University of Civil Engineering

Reference25 articles.

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Information modeling and life cycle management of construction projects in the city of Novocherkassk;Construction and Architecture;2023-06-27

2. 4D and 5D Design Processes Automation Using Databases, Classification and Applied Programming;Smart Innovation, Systems and Technologies;2021-10-05

3. USE OF GRAPHS IN THE DIGITAL MODEL OF A BUILDING;Construction and Architecture;2021-01-02

4. Some aspects of intelligent decision support systems in construction;IOP Conference Series: Materials Science and Engineering;2021-01-01

5. Creation of a network model on the basis of a universal sequence of construction works;Stroitel stvo nauka i obrazovanie [Construction Science and Education];2020-09-30

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3