Creation of a network model on the basis of a universal sequence of construction works

Author:

Karakozova Irina V.1,Pavlov Alexander S.2

Affiliation:

1. Moscow State Autonomous Institution Research analytical center (NIAZ); Moscow State University of Civil Engineering (National Research University) (MGSU)

2. All-Russian Research Institute for Nuclear Power Plants Operation (VNIIAES)

Abstract

Introduction. Building information modeling is the main direction of development of automated design and control systems. An important component of information modeling is the transfer of data into construction management systems. The most complicated issue is the problem of creating the correct graph topology relevant to the process sequence and construction management experience. The development of automated progress schedule compilation system based on the use of a universal sequence developed earlier is examined. Materials and methods. As a result of the analysis of the progress schedule compilation process, the topology creation algorithm is divided into several stages. At the first stage, a text description of the information model is given, which is then converted into a list of building or structure elements. The list of elements should be transformed into the work item list and then supplemented with work items not reflected in the list of elements. This is a separate complex task, which is not examined in this study, and is the direction of further research by the authors. At the next stage, the work items in the list are assigned codes that define the location of the scope of works in time and space. Results. An algorithm for converting the work item list into a coherent work schedule, the topology of which takes into account the spatial location of the work area and the sequence of interrelated processes over time, has been developed. The sequence of works is determined by a preliminarily designed universal list. The list of requirements for the information produced by BIM models is developed. Splitting the algorithm into stages allows for manual correction of the work item list and the properties of work items, if necessary. Conclusions. The developed method allows for automation of the processes of creating construction plans based on the list of building elements and universal work sequence. At any implementation stage, the work item list may be interactively changed and supplemented. In the future, it is necessary to form a set of parameters for structural elements that will allow automating the choice of technological processes.

Publisher

Moscow State University of Civil Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3