1. Installation and inactive commissioning of the JET active gas handling system (AGHS);Hemmerich,1993
2. The commissioning of the LHC technical systems;Saban,2007
3. Progress in design integration and configuration control of the ITER machine baseline;Kuehn,2009
4. Minutes of Workshop Commissioning of W7-X, Greifswald, January 16–18,2013
5. Quality assurance during assembly of Wendelstein 7-X;Fusion Eng. Des.,2011