Author:
Mock Brant,O’Connor James T.
Abstract
Purpose
The purpose of this study is to discover which solution strategies to common industrial commissioning and startup (CSU) problems (Hot Spots) owner and contractor organizations identify as most effective and to identify which strategies are identified by one or both organization types.
Design/methodology/approach
Ratings for the relative value provided by strategies, and the effort required to implement strategies were solicited from CSU industry experts employed by owner or contractor organizations via a survey. Quantitative modelling using the Possible, Implement, Challenge, Kill (PICK) chart method distinguished high-value, low-effort strategies from other strategies.
Findings
Owners and contractors identify distinct sets of CSU solution strategies as high value and low effort, with some overlap. Of 178 total strategies, 40 (22.5 per cent) were identified by owners and 34 (19.1 per cent) by contractors, with 19 (10.7 per cent) of those strategies in common. Strategies with the greatest differences in opinions between owners and contractors are also identified.
Research limitations/implications
Research findings are limited to industrial-type, operational systems-intensive facilities. Similarities may exist with other systems-intensive project types, such as some commercial or infrastructure projects. The survey sample size is relatively small (n = 35), but close to that of other CSU-related surveys. The majority of survey participants were based in North America at the time of participation. Further, the number of contractor and owner participants differed slightly.
Practical implications
CSU managers and personnel should consider using high-value, low-effort strategies before resorting to other less effective strategies, as applicable on their projects. Depending on which organization is executing CSU, or if both organization types share CSU responsibilities, different solution strategies may be most effective.
Originality/value
Differences in owner and contractor perspectives and opinions have been noted in other aspects of the project lifecycle but never for CSU solution strategies. Use of the strategies identified will support more effective CSU execution.
Subject
Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering
Reference60 articles.
1. Holm’s sequential bonferroni procedure,2012
2. Analysis of factors influencing project cost estimating practice;Construction Management and Economics,2000
3. BIM for client organisations: a continuous improvement approach;Construction Innovation,2015
4. Statistical tests,2017
5. Deal with start-up and commissioning threats and challenges at an early stage of the project for a sucessful handover and project completion,2012
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献