Risk Allocation Optimization between Owner and Contractor in Construction Projects by Using the UTA-STAR Method

Author:

Ebrahimi Malekshah Mohammad EbrahimORCID,Mehdiabadi AmirORCID,Pourmansouri Rezvan,Spulbar Cristi,Birau RamonaORCID

Abstract

Project risk is an uncertain situation or event that, if it occurs, may have a negative or positive effect on one or more project objectives, such as scope, schedule, cost, and quality. Major industrial projects are increasingly facing complexity and uncertainty. The scope of this paper is related to petrochemical projects, in which risks directly affect the approved time, cost, and quality of the project. In such projects, there are risks that neither the owner nor the contractor has the main role in the occurrence or prevention of, and it is not easy to determine who is responsible for them. In such projects, there are risks that neither the owner nor the contractor has the main role in the occurrence or prevention of, and for which it is not easy to determine responsibility. Therefore, predicting, identifying, analyzing, and determining of the optimal allocation of risk responsibility between contracting parties is one of the most important steps before the start of the project. Suppose it is not correctly allocated among project stakeholders, then, in that case, risk responsibility imposes costs on the project that must be paid by the owner, contractor, and partnership, causing, in general, many problems for project management. Therefore, this paper presents a model to calculate the optimal ratio of risk allocation between the project parties in the concluding contract stage, using the UTA-STAR technique to obtain the owner and contractor utility function to create as much of a win-win relationship between them as possible.

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

Reference78 articles.

1. Due Diligence Handbook: Corporate Governance, Risk Management and Business Planning;Spedding,2009

2. Risk management and risk management performance measurement in the construction projects of Finland

3. Quantitative Analysis of Safety Risks and Relationship with Delayed Project Completion Times

4. Development of a Systems Approach to Assessment of Investment Project Risks: Risks of Unacceptably Low Project Profitability;Vasiliev;E. Eur. J. Enterp. Technol.,2022

5. Risk analysis and management in construction

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3