1. Assis, W. O., & Milani, B. E. A. (2000). Geração de Programa Horário para Linhas Metroviárias Utilizando Programação Linear. In Anais do XIII CBA. Florianópolis SC, Brazil.
2. Bemporad, A., Borrelli, F., & Morari, M. (2000). The explicit solution of constrained LP-based receding horizon control. In Proceedings of 39th IEEE CDC, Sydney, Australia (pp. 632–637).
3. Bergamashi, F. A., Milani, B. E. A., & Hsin, T. C. (1982). Geração de Horários de Despacho de Trens em Linhas de Transporte Metroferroviário. In Anais do IV CBA, Campinas SP, Brazil (pp. 219–224).
4. A methodology for generation of optimal schedules for an underground railway system;Cury;IEEE Transactions on Automatic Control,1980
5. Optimization theory for large systems;Lasdon,1970