1. CNSC, Regulatory Oversight Report for Canadian Nuclear Power Generating Sites: 2017. Annual Report, 2017. , (accessed 30.01.20).
2. N285.4, Periodic Inspection of CANDU Nuclear Power Plant Comments;CSA,2014
3. Ontario hydro’s leak before break approach: application to the Darlington (CANDU) Nuclear Generating Station A;Nathwani;Nucl. Eng. Des.,1989
4. N. Azer, D.H. Barber, P.J. Boucher, P.J. Ellis, J.K. Mistry, V.P. Singh, et al., Leak Dectection Capability in CANDU Reactors. Specialist Meeting on Leak Before Break in Reactor Piping and Vessels. Lyon, France, 1995.
5. Leak-before-break in the pressure tubes of CANDU reactors;Moan;Int. J. Press. Vessel. Pip.,1990