1. Delayed hydride cracking in Zr-2·5% Nb alloy;Coleman;Reviews of Coatings and Corrosion,1979
2. Evaluation of a leaking crack in an irradiated CANDU pressure tube;Coleman;AECL Report, AECL 9733,1988
3. An overview of the development of leak detection monitoring for Ontario Hydro Nuclear Stations;Kenchington,1987
4. Annulus Gas System response tests for Pickering NGS A, Unit 1 commissioning;Kenchington,1988
5. A probabilistic approach to Leak-Before-Break in CANDU pressure tubes;Walker;Int. J. Pres. Ves. & Piping,1990