1. Addressing automated materials handling in an existing wafer fab;Davis;Semicond Int,1995
2. Track-robot for wafer fabrication intrabay handling;Cardarelli;Assem Automat,1993
3. Jefferson T. Simulation in the design of ground-based intrabay automation systems. Proceedings of the IEEE Winter Simulation Conference, Coronado, CA, USA 1996. p. 1008–13.
4. Mackulak GT, Lawrence FP, Rayter J. Simulation analysis of 300mm intrabay automation vehicle capacity alternatives. IEEE/SEMI Advanced Semiconductor Manufacturing Conference, Boston, MA, USA 1998. p. 445–50.
5. 300mm factory layout and automated materials handling;Wright;Solid State Technol,1999