Author:
Kapanoglu Muzaffer,Alikalfa Mete
Subject
Industrial and Manufacturing Engineering,Computer Science Applications,General Mathematics,Software,Control and Systems Engineering
Reference22 articles.
1. Supplement to resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques. Graduate School of Industrial Administration;Lawrence,1984
2. Dynamic selection of dispatching rules for manufacturing system scheduling;Pierreval;International Journal of Production Research,1997
3. Using multi-agent architecture in FMS for dynamic scheduling;Kouiss;Journal of Intelligent Manufacturing,1997
4. A comparison of analytic and knowledge-based approaches to closed-shop scheduling;Alpar;Annals of Operations Research,1989
5. A knowledge-based approach to industrial job-shop scheduling;Bel,1989
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献