1. A proposed model for prediction motorist delays at two-lane highway work zones;Cassidy;ASCE Journal of Transportation Engineering,1993
2. Cassidy, M.J., Son, Y.T., Rosowsky, D.V., 1993. Predicting vehicle delay during maintenance or reconstruction activity on two-lane highways. Final report no. CE-TRA-93-1. Purdue University, West Lafayette, IN.
3. Estimation motorist delay at two-lane highway work zones;Cassidy;Transportation Research,1994
4. Ceder, A., 1993. Traffic behavior during lane closure periods of two-lane road. In: Daganzo, C. (Ed.), Proceedings 12th International Symposium on Transportation and Traffic Theory. Elsevier, New York.
5. Ceder, A., Regueros, A., 1990. Traffic control (at alternate one-way sections) during lane closure periods of a two-way highway. In: Koshi, M. (Ed.), Proceedings 11th International Symposium on Transportation and Traffic Theory. Elsevier, New York, pp. 551–568.