1. Calculation Sheet of the Primary Containment Pressure and Temperature Responses to the Recirculation Line Break of the Chinshan Units 1 and 2, Rev. 2, CS-SPU-EE-CTMT2-R2;Chen,2010
2. Safety Analysis Report for Measurement Uncertainty Recapture (MUR) Power Uprate, Rev. 1, CS-MUR-SAR-R1;Chinshan Nuclear Power Station,2007
3. Calculation Sheet of the Blowdown Data of the Recirculation Line Break of the Chinshan Units 1 and 2, Rev.0, CS-SPU-EE-CTMT1-R0;Dai,2009
4. Calculation Sheet of the Blowdown Data of the Main Steam Line Break of the Chinshan Units 1 and 2, Rev.0, CS-SPU-EE-CTMT3-R0;Dai,2009
5. Calculation Sheet of the Blowdown Data of the Feedwater Line Break of the Chinshan Units 1 and 2, Rev.0, CS-SPU-EE-CTMT5-R0;Dai,2009