1. Batectel Inc, 1974, Calculation Sheet: Standby Gas Treatment System, M89.0001, Kuosheng Units 1 and 2, Revision 2.
2. Brown, D.P., Haynes, S.J., Snyder, J.D., 1995, Secondary Containment drawdown analysis for Washington Public Power Supply System Nuclear Project Plant 2, National heat transfer conference: Proceedings. Volume 14.
3. Pressure and temperature analyses using GOTHIC for Mark I containment of the Chinshan Nuclear Power Plant;Chen;Nucl. Eng. Des.,2011
4. Taiwan Power Company, 2002, Reactor Auxiliary Building – Heat Loads and Air Flow Distribution, M90.0000.
5. Enercon Services INC, 2004, Gothic Model of BWR Secondary Containment Drawdown Analyses.