1. The relation between three-tired client-server internet database and two-machine flowshop;Al-Anzi;International Journal of Parallel and Distributed Systems and Networks,2001
2. Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications;Allahverdi;Computers and Operations Research,2002
3. Al-Anzi FS, Allahverdi A. A new tabu search heuristic for distributed database problem modeled as a two-stage assembly scheduling problem 2004 submitted.
4. Optimization Algorithms for Distributed Queries;Apers;IEEE Transactions on Software Engineering,1983
5. Deciding on Correct Distributed Query Processing;Bodorick;IEEE Transactions of Knowledge Data Engineering,1992