Author:
Allahverdi Ali,Al-Anzi Fawaz S.
Subject
Management Science and Operations Research,Modelling and Simulation,General Computer Science
Reference28 articles.
1. Complexity of machine scheduling problems;Lenstra;Annals of Discrete Mathematics,1977
2. On two-machine scheduling with release dates and due dates to minimize maximum lateness;Grabowski;Opsearch,1980
3. Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness;Allahverdi;Computers & Operations Research,1996
4. Optimal policies for a deterministic two-machine semi-ordered flowshop with maximum lateness objective;Allahverdi;Transactions on Operational Research,1994
5. Job lateness in a two-machine flowshop with setup times separated;Dileepan;Computers Operations Research,1991
Cited by
28 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献