Author:
Peterson Ben,Harjunkoski Iiro,Hoda Samid,Hooker J.N.
Subject
Management Science and Operations Research,Modelling and Simulation,General Computer Science
Reference33 articles.
1. A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints;Armstrong;Eur J Oper Res,1994
2. Aron I, Genç-Kaya L, Harjunkoski I, Hoda S, Hooker JN. Factory crane scheduling by dynamic programming. In: Wood RK, Dell RF, editors. Operations research, computing and homeland defense. INFORMS; 2011. p. 93–107.
3. Baptiste P, Legeard B, Manier MA, Varnier C. A scheduling problem optimisation solved with constraint logic programming. In: Second international conference on the practical application of prolog. London; 1994. p. 47–66.
4. Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach;Che;Int J Prod Res,2004
5. The crane scheduling problem;Daganzo;Transp Res Part B,1989
Cited by
31 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献