Author:
Armstrong Ronald,Lei Lei,Gu Shanhong
Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference8 articles.
1. The minimum common-cycle algorithm for cyclic scheduling of two hoists with time window constraints;Lei;Management Science,1991
2. A proof: The cyclic hoist scheduling problem is NP-complete;Lei,1989
3. Lei, L., and Wang, T.J., “On the optimal cyclic schedules of single hoist electroplating processes”, IIE Transactions (in press).
4. Crane scheduling problems;Lieberman;AIIE Transactions,1981
5. A crane scheduling problem in a computer-integrated manufacturing environment;Matsuo;Management Science,1991
Cited by
43 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献