Author:
Laajili Emna,Lamrous Sid,Manier Marie-Ange,Nicod Jean-Marc
Subject
General Engineering,General Computer Science
Reference55 articles.
1. A greedy algorithm to determine the number of transporters in a cyclic electroplating process;Armstrong;IIE Transactions,1996
2. A bounding scheme for deriving the minimal cycle time of a single-transporter n-stage process with time-window constraints;Armstrong;European Journal of Operational Research,1994
3. Baptiste, P., Legeard, B., Varnier, C. (1992). Hoist scheduling problem: An approach based on constraint logic programming. In 1992 IEEE international conference on robotics and automation, 1992. Proceedings (pp. 1139–1144). IEEE.
4. Optimization with constraint logic programming: the hoist scheduling problem solved with various solvers;Baptiste;Application of Artificial Intelligence in Engineering,1993
5. Bemporad, A. (2004). Hybrid Toolbox – User’s Guide. http://cse.lab.imtlucca.it/bemporad/hybrid/toolbox.
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献