1. Düzgün sıralı iş yerlerindeki statik sıralama problemlerinde toplam iş akış süresinin enazlanması için yeni bir Sezgisel Yöntem;Aksoy;Yöneylem Araş.,1980
2. Aslan, D. (1999). Model development and application based on object oriented neural network for scheduling problem. DEU Res. Fund. Proj., Nr. 0908.97.07.01. University of Dokuz Eylul, Izmir.
3. Introduction to sequencing and scheduling;Baker,1974
4. A heuristic algorithm for the n-job, m-machine sequencing problem;Campbell;Management Science,1970
5. Artificial neural networks for intelligent manufacturing;Dagli,1994