Author:
Al-Dhaheri Noura,Jebali Aida,Diabat Ali
Subject
General Engineering,General Computer Science
Reference35 articles.
1. The quay crane scheduling problem;Al-Dhaheri;Journal of Manufacturing Systems,2015
2. A Lagrangian-relaxation-based heuristic for the multiship quay crane scheduling problem with ship stability constraints;Al-Dhaheri;Annals of Operations Research,2016
3. A simulation based Genetic Algorithm approach for the quay crane scheduling under uncertainty;Al-Dhaheri;Simulation Modelling Practice and Theory,2016
4. A fast heuristic for quay crane scheduling with interference constraints;Bierwirth;Journal of Scheduling,2009
5. A survey of berth allocation and quay crane scheduling problems in container terminals;Bierwirth;European Journal of Operational Research,2010
Cited by
36 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献