1. Ak, A., Erera, A.L., 2006. Simultaneous berth and quay crane scheduling for container ports, Working Paper, H. Milton Stewart School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta.
2. Bierwirth, C., Meisel, F., 2009. A fast heuristic for quay crane scheduling with interference constraints. Journal of Scheduling, doi: 10.1007/s10951-009-0105-0.
3. A multiple-crane-constrained scheduling problem in a container terminal;Bish;European Journal of Operational Research,2003
4. Briano, C., Briano, E., Bruzzone, A.G., 2005. Models for support maritime logistics: a case study for improving terminal planning. In: Merkuryev, Y., Zobel, R., Kerckhoffs, E. (Eds.), Proceedings of the 19th European Conference on Modelling and Simulation (ECMS). pp. 199–203.
5. Optimizing submarine berthing with a persistence incentive;Brown;Naval Research Logistics,1997