1. Ballard, G. (1999). Improving work flow reliability. Proceedings of the 7th annual conference of the international group for lean construction, pp. 275–286.
2. Browning, T. R. (1998). Use of dependency structure matrices for product development cycle time reduction. Proceedings of the fifth ISPE international conference on concurrent engineering: research and applications (pp. 15–17). Tokyo, Japan.
3. Graph theory with applications to engineering and computer science;Deo,1974
4. A model-based method for organizing tasks in product development;Eppinger;Research in Engineering Design,1994
5. Effects of concurrent engineering on make-to-order products;Handfield;IEEE Transaction on Engineering Management,1994