Author:
Xie Jinxing,Lee T.S,Zhao Xiande
Subject
General Engineering,General Computer Science
Reference28 articles.
1. A comparison of strategies to dampen nervousness in MRP systems;Blackburn;Management Science,1986
2. Alternative approaches to schedule instability: a comparative analysis;Blackburn;International Journal of Production Research,1987
3. A heuristic solution procedure for the multi-item single level, limited capacity, lot sizing problem;Dixon;Journal of Operations Management,1981
4. A comprehensive review of production lot-sizing;Eftekharzadeh;International Journal of Physical Distribution and Logistic Management,1993
5. Numerical evaluation of heuristics for the multi-item single-level capacitated lot-size problem;Gunther;Engineering Costs and Production Economics,1988
Cited by
34 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献