Abstract
A comprehensive review of the literature for the problem of
lot‐size scheduling (serial and assembly) considering the uncapacitated
problem and complicated capacitated assembly manufacturing structure.
Analyses the different solution techniques and findings for each product
set.
Subject
Management of Technology and Innovation,Transportation
Reference120 articles.
1. Billington, P.J. "Multi-level Lot-sizing with a Bottleneck Work Center", PhD Dissertation,Graduate School of Cornell University, May 1983.
2. Improved Heuristics for Multi-Stage Requirements Planning Systems
3. Planning horizons for master production scheduling
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献