Subject
General Engineering,General Computer Science
Reference22 articles.
1. The impact of priority rule combinations on lateness and tardiness;Barman;IIE Transactions,1998
2. Chandiramani, V., Jayaseelan, R., Nathan, V. S. L., & Priya, K. S. (2004). A neural network approach to process assignment in multiprocessor systems based on the execution time. Proceedings of International Conference on Intelligent Sensing and Information Processing (ICISIP 2004), Chennai, India, 332–335.
3. A neural networks approach for due-date assignment in a wafer fabrication factory;Chang;International Journal of Industrial Engineering,2003
4. Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory;Chang;Applied Soft Computing,2006
5. Chang, P. -C., Hsieh, J. -C., & Liao, T. W. (2001). A case-based reasoning approach for due date assignment in a wafer fabrication factory. Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001), Vancouver, British Columbia, Canada.
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献