Author:
Chen Tin-Chih Toly,Wang Yu-Cheng
Abstract
AbstractA fuzzy dynamic-prioritization agent-based system was developed in this study to improve the forecasting of the cycle time of a job in a wafer fabrication plant (wafer fab). In this system, multiple fuzzy agents forecast the cycle time of a job from various viewpoints, after which the aggregation and evaluation agent aggregates these fuzzy cycle time forecasts using an innovative operator (i.e., the fuzzy weighted intersection) into a single representative value. Subsequently, the optimization agent varies the authority levels of the fuzzy cycle time forecasting agents to optimize the forecasting performance. A practical example was used to evaluate the effectiveness of the fuzzy dynamic-prioritization agent-based system. The experiment results indicated that the fuzzy dynamic-prioritization agent-based system outperformed three rival methods in improving forecasting accuracy. In addition, the forecasting performance could be enhanced by discriminating the authority levels of the fuzzy cycle time forecasting agents.
Publisher
Springer Science and Business Media LLC
Subject
General Earth and Planetary Sciences,General Environmental Science
Reference63 articles.
1. Baral C, Fuentes O, Kreinovich V (2018) Why deep neural networks: a possible theoretical explanation. Constraint programming and decision making: theory and applications. Springer, Cham, pp 1–5
2. Callaghan MJ, Harkin J, McColgan E, McGinnity TM, Maguire LP (2007) Client–server architecture for collaborative remote experimentation. J Netw Comput Appl 30(4):1295–1308
3. Cao Y, Gu Q (2019) Generalization bounds of stochastic gradient descent for wide and deep neural networks. In: Advances in neural information processing systems, pp 10836–10846
4. Chan KY, Kwong CK, Dillon TS, Tsim YC (2011) Reducing overfitting in manufacturing process modeling using a backward elimination based genetic programming. Appl Soft Comput 11(2):1648–1656
5. Chang PC, Hsieh JC, Liao TW (2001) A case-based reasoning approach for due date assignment in a wafer fabrication factory. In: Proceedings of the international conference on case-based reasoning, Canada: Vancouver
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献