Author:
Talens Carla,Perez-Gonzalez Paz,Fernandez-Viagas Victor,Framinan Jose M.
Funder
Gobierno de España Ministerio de Ciencia e Innovación
Government of Andalusia
Subject
General Engineering,General Computer Science
Reference56 articles.
1. Coordinated scheduling of customer orders for quick response;Ahmadi;Naval Research Logistics,2005
2. A Hybrid Tabu Search Heuristic for the Two-Stage Assembly Scheduling Problem;Al-Anzi;International Journal of Operations Research,2006
3. Empirically discovering dominance relations for scheduling problems using an evolutionary algorithm;Al-Anzi;International Journal of Production Research,2006
4. A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times;Al-Anzi;European Journal of Operational Research,2007
5. Better Heuristics for a Two-Stage Multi- Machine Assembly Scheduling Problem to Minimize Total Completion Time Better Heuristics for a Two-Stage Multi-Machine Assembly Scheduling Problem to Minimize Total Completion Time;Al-Anzi;International Journal of Operations Research,2012
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献