Publisher
Springer Nature Switzerland
Reference15 articles.
1. Agrawal, A., Harhalakis, G., Minis, I., Nagi, R.: Just-in-time production of large assemblies. IIE Trans. 28(8), 653–667 (1996)
2. Behnke, D., Geiger, M.J.: Test instances for the flexible job shop scheduling problem with work centers. In: Research Report RR-12-01-01 (2012)
3. Chan, F., Wong, T., Chan, L.: Lot streaming for product assembly in job shop environment. Rob. Comput.-Integr. Manuf. 24(3), 321–331 (2008)
4. Dastidar, S.G., Nagi, R.: Batch splitting in an assembly scheduling environment. Int. J. Prod. Econ. 105(2), 372–384 (2007)
5. Defersha, F.M., Rooyani, D.: An efficient two-stage genetic algorithm for a flexible job-shop scheduling problem with sequence dependent attached/detached setup, machine release date and lag-time. Comput. Ind. Eng. 147, 106605 (2020)