Author:
Taghaddos Hosein,Hermann Ulrich,Abbasi ArioBarzan
Funder
PCL Industrial Management Inc.
Natural Science and Engineering Research Council
Tecnosa R&D center
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference35 articles.
1. Simulation-based resource leveling in multi-project construction;Taghaddos,2008
2. Integrated simulation-based scheduling for module assembly yard;Taghaddos,2009
3. Computer-aided planning for heavy lifts;Hornaday;J. Constr. Eng. Manag.,1993
4. Multiple heavy lifts optimization;Lin;J. Constr. Eng. Manag.,1996
5. Adaptive probabilistic neural network-based crane type selection system;Sawhney;J. Constr. Eng. Manag.,2002
Cited by
66 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献