Developing a fast and accurate collision detection strategy for crane-lift path planning in high-rise modular integrated construction
-
Published:2024-08
Issue:
Volume:61
Page:102509
-
ISSN:1474-0346
-
Container-title:Advanced Engineering Informatics
-
language:en
-
Short-container-title:Advanced Engineering Informatics
Author:
Zhu Aimin,
Zhang Zhiqian,
Pan WeiORCID
Reference58 articles.
1. A.G.F. Gibb, Off-site fabrication prefabrication, preassembly and modularisation, Whittles Publishing. (1999), ISBN: 0-470-37836-0.
2. W. Pan, C.K. Hon, Briefing: Modular integrated construction for high-rise buildings, Proceedings of the Institution of Civil Engineers - Municipal Engineer. 173 (2020) pp. 64-68, https://doi:10.1680/jmuen.18.00028.
3. Crane-lift path planning for high-rise modular integrated construction through metaheuristic optimization and virtual prototyping;Zhu;Autom. Construct.,2022
4. Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction;Zhang;Autom. Constr.,2021
5. Prediction of hoisting time for tower cranes for public housing construction in Hong Kong;Leung;Constr. Manag. Econ.,1999
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献