Author:
Kim Hyunjoo,Soibelman Lucio,Grobler Francois
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference34 articles.
1. Construction claims and disputes: causes and cost/time overruns;Semple;Journal of Construction of Engineering and Management, ASCE,1994
2. Data preparation process for construction knowledge generation through knowledge discovery in databases;Soibelman;Journal of Computing in Civil Engineering, ASCE,2002
3. Generic methodology for analyzing delay claims;Kartam;Journal of Construction Engineering and Management, ASCE,1999
4. Method for calculating schedule delay considering lost productivity;Lee;Journal of Construction Engineering and Management, ASCE,2005
5. Window Analyses of compensable delays;Finke;Journal of Construction Engineering and Management, ASCE,1999
Cited by
41 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献