1. Alkass S. Mazerolle M. Tribaldos E. and Harris F. (1995). “Computer aided construction delay analysis and claims preparation.” Constr. Mgmt. and Economics 13(4) 335–352.
2. Kallo G. (1996). “The reliability of critical path method (CPM) techniques in the analysis and evaluation of delay claims.” Cost Engrg . 38(5) 35–37.
3. Concurrent Delays in Construction Projects
4. Schumacher L. (1996). “An integrated and proactive approach for avoiding delay claims on major capital projects.” Cost Engrg . 38(6) 37–39.
Cited by
49 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Automated Management of Time Extension Claims;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2024-05
2. A comprehensive review of delay analysis techniques for solving concurrent delays;Engineering, Construction and Architectural Management;2024-02-20
3. Assessing the Delay, Cost, and Quality Risks of Claims on Construction Contract Performance;Buildings;2024-01-25
4. Framework for the Application of Blockchain Technology to Delay Analysis;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2023-05
5. Knowledge map of stakeholder management in construction projects;MEGARON / Yıldız Technical University, Faculty of Architecture E-Journal;2023