Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities

Author:

Andrade Paulo André de,Martens Annelies,Vanhoucke Mario

Publisher

Elsevier BV

Subject

Building and Construction,Civil and Structural Engineering,Control and Systems Engineering

Reference22 articles.

1. Earned Value Project Management;Fleming,2010

2. Schedule is different;Lipke;The Measurable News,2003

3. A comparison of different project duration forecasting methods using earned value metrics;Vandevoorde;Int. J. Proj. Manag.,2006

4. EDM: Earned Duration Management, a new approach to schedule performance management and measurement;Khamooshi;Int. J. Proj. Manag.,2014

5. Connecting earned value to the schedule;Lipke;The Measurable News Winter,2004

Cited by 44 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Enhanced ESM approach for duration forecasting in delayed projects;Ain Shams Engineering Journal;2024-03

2. Linear Methods for Estimating Schedule Time Earned: Theory and Application;Journal of Management in Engineering;2024-01

3. Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables;Engineering, Construction and Architectural Management;2023-12-26

4. A machine learning study to improve the reliability of project cost estimates;International Journal of Production Research;2023-09-25

5. Selecting EVM, ESM and EDM(t) for managing construction project schedule;Engineering, Construction and Architectural Management;2023-06-16

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3