Author:
Al-alawi Mubarak,Bouferguene Ahmed,Mohamed Yasser
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference31 articles.
1. Simulation model to forecast completion time;Ahuja;J. Constr. Eng. Manag.,1985
2. Factor model of construction productivity;Randolph;J. Constr. Eng. Manag.,1987
3. Loss of labour productivity due to delivery methods and weather;Randolph;J. Constr. Eng. Manag.,1999
4. Climatic effects on construction;Koehn;J. Constr. Eng. Manag.,1985
5. Threshold Limit Values (TLV) and Biological Exposure Indices (BEI);ACGIH,2008
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献