Author:
Bakry Ibrahim,Moselhi Osama,Zayed Tarek
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference27 articles.
1. Optimization of project time–cost trade-off problem with discounted cash flows;Ammar;Journal of Construction Engineering and Management, ASCE,2011
2. Challenges in line-of-balance scheduling;Arditi;Journal of Construction Engineering and Management, ASCE,2002
3. Finance-based scheduling: tool to maximize project profit using improved genetic algorithms;Elazouni;Journal of Construction Engineering and Management, ASCE,2005
4. Resource allocation via dynamic programming in activity networks;Elmaghraby;European Journal of Operational Research,1993
5. Optimized Scheduling for Repetitive Construction Projects;Elrayes,1997
Cited by
44 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献