Author:
Antoniou Fani,Aretoulis Georgios N.,Konstantinidis Dimitrios,Kalfakakou Glykeria P.
Reference28 articles.
1. Antoniou, F., & Kalfakakou, G. (2009). Selection criteria used for the choice of procurement system for major highway construction projects. Proceedings of the 5th International Conference on Construction in the 21st Century (CITC-V) Collaboration and Integration in Engineering, Management and Technology, Istanbul, Turkey, May 20-22.
2. Antoniou, F., Aretoulis, G., Konstantinidis, D., & Kalfakakou, G. (2012). Selection criteria used for the choice of contract type for major highway construction projects. Proceedings of the Transport Research Arena: Sustainable Mobility through Innovation, Athens 23-26 April.
3. Baccarini, D. (1996). The concept of project complexity a review. International Journal of Project Management, 14(4), pp. 201-204.
4. Berends, T.C. (2000). Cost plus incentive fee contracting - experiences & structuring. International Journal of Project Management, 18(3), pp. 165-171.
5. Boukendour, S., & Bah, R. (2001). The guaranteed maximum price contract as call option. Construction Management and Economics, 19(6), pp. 563-567.
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献