1. Evaluation of potential for pipe breaks,1984
2. Leak before break evaluation procedure, USNRC report, NUREG-800;Standard Review Plan,1987
3. A Study on Applicability of Improved Material Specification for Enhancing Safety Margin of Nuclear Pipings, KAERI Report;Yu,2004
4. Application of lbb to high energy pipings of a pressurized water reactor in Korea;Lee;Nucl. Eng. Des.,1999
5. Leak-Before Break Assessment Margin of Improved Main Steam Pipe Material;Kim,2019