Author:
Rodrigues Monica,Walter Arnaldo,Faaij André
Subject
General Energy,Pollution,Mechanical Engineering,Building and Construction,Electrical and Electronic Engineering,Industrial and Manufacturing Engineering,Civil and Structural Engineering
Reference19 articles.
1. Thermal gasification of biomass technology development: end of task report for 1992 to 1994;Babu;Biomass and Bioenergy,1995
2. Gasification of biomass wastes and residues for electricity production;Faaij;Biomass and Bioenergy,1997
3. Biomass-gasifier/aero-derivative gas turbine combined cycles. Part A—technologies and performance modeling;Consonni;Journal of Engineering for Gas Turbines and Power,1996
4. Gas turbine theory;Cohen,1996
5. Walter A, Llagostera J, Gallo W. Impact of gas turbine de-rating on the performance and on the economics of BIG-GT cycles. In: Proceedings of ASME Advanced Energy Systems Division, ASME International Mechanical Engineering Congress and Exposition, Anaheim, USA 1998. pp. 67–72
Cited by
70 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献