Author:
Pearn W.L.,Chung S.H.,Chen A.Y.,Yang M.H.
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Economics and Econometrics,General Business, Management and Accounting
Reference17 articles.
1. Parallel savings based heuristics for the delivery problem;Altinkemer;Operations Research,1991
2. Parallel machine scheduling with release time and machine eligibility restrictions;Centeno;Computers and Industrial Engineering,1997
3. Scheduling for IC sort and test with preemptiveness via Lagrangian relaxation;Chen;Transactions on Systems, Man, and Cybernetics,1995
4. Chikamura, A., Nakamae, K., Fujioka, H., 1997. Effect of express lots on production dispatching rule scheduling and cost in final test process of LSI manufacturing system. IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings, D23–D26.
5. Scheduling vehicles from a central depot to a number of delivery points;Clark;Operations Research,1964
Cited by
47 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献