Author:
Sun Xiaoqing,Noble James S.
Subject
Industrial and Manufacturing Engineering,Hardware and Architecture,Software,Control and Systems Engineering
Reference19 articles.
1. Impact of Sequence-Dependent Setup Time on Job Shop Scheduling Performance;Kim;Int'l Journal of Production Research,1994
2. Production Planning, Control and Integration;Sipper,1997
3. Kanban, MRP, and Shaping the Manufacturing Environment;Krajewski;Mgmt. Science,1987
4. Managing Capacity: Getting the Most from Your Firm's Asset;Wortman;Industrial Engg.,1992
5. Rolling Horizon Algorithms for a Single Machine Dynamic Scheduling Problem with Sequence Dependent Setup Times;Ovacik;Int'l Journal of Production Research,1994
Cited by
26 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献