1. Cheng X. and Lester A. H. (2001) A Methodology for oversized vehicle trip scheduling. University of Virginia [interaktyvus], [žiūrėta 2011 m. lapkričio 9 d.]. Available from Internet:http://www.cts.virginia.edu/docs/UVACTS–14-13-23.pdf.
2. Dėjus, T. (2011) Safety of technological projects using multi-criteria decisions making methods, Journal of Civil Engineering and Management 17(2): 177-183.DOI:10.3846/13923730.2011.576809.
3. DIOMIS, Study on capacity rezerve [interaktyvus] 2007. Available from Internet:http://www.railfreightportal.com/Major-traffic-flows-in-Europe.
4. Jang, K.; Sanghyeok, K.; Jongwon, S. and Ching-Yao C. (2011) Cross – Section Designs for the Safety Performance of Buffer-Separated High-Occupancy Vehicle (HOV) lanes, Safe Transportation Research & Education Center, p. 1-17.
5. Jarašūnienė A. (2009) Research on model application to restructuring the railway transport sector in Lithuania, Transport, 24(3), 135-140.ISSN 1648-3480. DOI:10.3846/1648-4142.2009.24.205-211.