Author:
Ayub Bilal,Thaheem Muhammad Jamaluddin,Din Zia ud
Reference27 articles.
1. Managing risk: in construction projects;Smith,2009
2. The construction of stable project baseline schedules;Herroelen;European Journal of Operational Research,2004
3. Dynamic Management of Risk Contingency in Complex Design-Build Projects;Marco;Journal of Construction Engineering and Management,2015
4. Achieving multiple project objectives through contingency management;Ford;Journal of Construction Engineering and Management,2002
5. Contingency estimation using a real options approach;Tseng;Construction Management and Economics,2009
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献