1. Amade, B., Akpan, E. O. P., Ukwuoma, F. P. O., & C.C. Alajemba, C. C. (2014). Project cost contingency in the nigerian construction industry. International Journal of Research in Management, Science & Technology, 2(2), 9–21.
2. Anderson, G. R., Mukherjee, A., & Onder, N. (2009). Traversing and querying constraint driven temporal networks to estimate construction contingencies. Automation in Construction, 18(6), 798–813.
3. Ayub, B., Thaheem, M. J., & Din, Z. (2016). Dynamic management of cost contingency: Impact of KPIs and risk perception. Procedia Engineering, 145, pp. 82–87.
4. Baccarini, D. (2004). Estimating Project Cost Contingency: Beyond the 10% syndrome. http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.622.2969&rep=rep1&type=pdf .Accessed 01 April 2019.
5. Bakhshi, P., & Touran, A. (2014). An overview of budget contingency calculation methods in construction industry. Procedia Engineering, 85, 52–60.