The effects of input control in a simple scheduling model

Author:

Baker Kenneth R.

Funder

Tuck Associates Program

Publisher

Wiley

Subject

Industrial and Manufacturing Engineering,Management Science and Operations Research,Strategy and Management

Reference5 articles.

1. R. Ahrens Basics of Capacity Planning and Control APICS 24th Conference Proceedings 1981 232 235

2. An Investigation of Due-Date Assignment Rules with Constrained Tightness;Baker;Journal of Operations Management,1981

3. A Dynamic Priority Rule for Scheduling Against Due-Dates;Baker;Journal of Operations Management,1982

4. R. Lankford Input/Output Control: Making it Work APICS 25th Conference Proceedings 1982 419 420

5. Input/Output Control: A Real Handle on Lead Time;Wight;Production and Inventory Management,1970

Cited by 69 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Non-hierarchical work-in-progress control in manufacturing;International Journal of Production Economics;2023-03

2. Improving coordination in assembly job shops: redesigning order release and dispatching;Flexible Services and Manufacturing Journal;2022-06-09

3. Dynamically adjusting the k-values of the ATCS rule in a flexible flow shop scenario with reinforcement learning;International Journal of Production Research;2021-07-01

4. Constant Work in Process;Verfahren der Fertigungssteuerung;2016

5. Improving labour relations performance using a Simplified Drum Buffer Rope (S-DBR) technique;Production Planning & Control;2015-08-28

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3