1. Baart, R., de Weerdt, M., He, L.: Single-machine scheduling with release times, deadlines, setup times, and rejection. Eur. J. Oper. Res. 291(2), 629–639 (2021)
2. Baker, K.R.: The effects of input control in a simple scheduling model. J. Oper. Manag. 4(2), 99–112 (1984)
3. Bodlaender, H.L., Fellows, M.R.: W[2]-hardness of precedence constrained k-processor scheduling. Oper. Res. Lett. 18(2), 93–97 (1995)
4. Bodlaender, H.L., van der Wegen, M.: Parameterized complexity of scheduling chains of jobs with delays. In: Cao, Y., Pilipczuk, M. (eds.) 15th International Symposium on Parameterized and Exact Computation (IPEC), December 14-18 2020, Hong Kong, China (Virtual Conference), LIPIcs, vol. 180, pp. 1–15 (2020)
5. Lecture Notes in Computer Science();R Bredereck,2016